Projects
SELECTED

Type A Environmental Permit


EU Support to Integrated Water Management (EUSIWM)

Determination of Waste Codes and Identification of Operations for Waste Disposal

Environmental Strategic Impact Assessment Report


National Strategy of Water Supply and Sewage System

Consultancy Service for CONSTAL Sh.p.k.
Service Contract With “Doko” l.t.d. for the Projects:
Environmental Management Plan
Environmental Impact Assessment report for the project: “Construction of photovoltaic plant 20.96 MWp and 35 kV Electric line, Zall – Shkumbin, Elbasan;
Rehabilitation report for the project: “Construction of photovoltaic plant 20.96 MWp and 35 kV Electric line, Zall – Shkumbin, Elbasan;
Profound Environmental Impact Assessment for the project: “400 kV SC OHL Fier - Elbasan - Qafë Thanë”, based on the contract between “Joint Venture Mitas Energy and Metal Construction Inc. – Doko” and Transmission System Operator, Albania with BMZ No.: 2010.66.992 - Lot 1: Overhead Lines, Contract No: OST/400 kV OHL-Albania-North Macedonia-Lot 1;
Environmental Management Plan for Biodiversity Protection for the project: “400 kV SC OHL Fier - Elbasan - Qafë Thanë”
Erosion Control Plan for the project: “400 kV SC OHL Fier - Elbasan - Qafë Thanë”
Landscape Management Plan for the project: “400 kV SC OHL Fier - Elbasan - Qafë Thanë”.
The Environmental Impact Report
For the Rehova mining area documents a comprehensive assessment of surface water quality conducted over three seasons—March, June, and September 2018. This monitoring initiative aimed to evaluate contamination levels from historical mining activities and ongoing operations, focusing on heavy metals such as lead, copper, arsenic, and manganese. Samples were collected from 15 points across the region, revealing that most contaminants were within permissible limits; however, elevated concentrations of lead, manganese, and zinc were noted in specific locations, indicating localized pollution. The study attributes these findings to residual impacts from the now-defunct copper processing plant and historical mining waste.


STRATEGIC ENVIRONMENTAL ASSESSMENT
- GIZ
Strategic Environmental Assessment for the draft document of the National Water Supply and Sewerage Services Sector, dated 25.6.2019.
- AKUM (National Agency of Water Supply, Sewerage and Waste Infrastructure)
Environmental Strategic Impact Assessment for the National Strategy of Water Supply and Sewage System, 2023 – 2030, which was drafted on 2023
- MoE (Ministry of Environment)
Environmental Strategic Impact Assessment Report for the Management Plan of “Albanian Alps” National Park, which was drafted during August 2017.
- ADA (Austrian Development Agency)
- Environmental Strategic Impact Assessment for Ishem River Basin Management Plan.
- Environmental Strategic Impact Assessment for Erzen River Basin Management Plan.
- Environmental Strategic Impact Assessment for Mat River Basin Management Plan.
- MINISTRY OF INFRASTRUCTURE AND ENERGY
- Strategic Environmental Assessment report for the Non-Food Strategy Policy Paper 2020-2025
- Strategic Environmental Assessment report for the Albanian Strategy for the Energy Sector
ENVIRONMENTAL IMPACT ASSESSMENT
- AKZM (National Agency of Protected Areas)Environmental Impact Assessment report for the projects:
- Multifunctional Center and Information Station in the National Park “Vjosa River”, Vlora;
- Multifunctional Center and Information Station in the National Park “Vjosa River”, Përmet;
- Multifunctional Center and Information Station in the National Park “Vjosa River”, Tepelenë.
- “Global Resource Trading” l.t.d.
Environmental Impact Assessment report for “Waste recovery plant for hazardous and non-hazardous waste (including R2, R3, R4, R7 or R10 operations)”;
- “V.B. Nerguti” l.t.d.
Environmental Impact Assessment report for the project: Hydropower Project “EL-EN”, Kukës
- “Ergi Pink” l.t.d.
Environmental Impact Assessment report for the project: Hydropower Project “Liseci”, Elbasan
- “DELIU 3D” l.t.d.
Environmental Impact Assessment report for the project: Hydropower Project “Shiroku”, Elbasan
- “Gjurr Reç” l.t.d.
Environmental Impact Assessment report for the project: Hydropower Project “Malla”, Kukës and Dibër Counties
- “Kisi Bio Energji” l.t.d.
Environmental Impact Assessment report for the project: Hydropower Project “Kacni”, Dibër
- “GD – Energy” l.t.d
Environmental Impact Assessment report for the project: Hydropower Project “Suka”, Kukës
- “Elenergji” l.t.d.
Environmental Impact Assessment report for the project: Hydropower Project “Bushtrica 1”, Elbasan
- “Bushtrica 2017” l.t.d.
Environmental Impact Assessment report for the project: Hydropower Project “Bushtrica 2”, Elbasan
- “Rozafa” l.t.d.
Environmental Impact Assessment report for the project: “Construction of the Rozafa Energji photovoltaic plant 10 mwp, Elbasan.”
- “Grand Kompani” l.t.d.
Environmental Impact Assessment report for the project: “Construction of the Fushë Buall photovoltaic plant 50 mwp, 110kv electric line, and 110/35 kv substation, Elbasan.”
- “Infra Solar” t.d.
Environmental Impact Assessment for the project: “Photovoltaic plant Infra Solar, 15 MW, Fier”
- “Construction Energy Parts” l.t.d.
Environmental Impact Assessment for the project: “Photovoltaic plant Construction Energy Parts, 2 MW, Fier”
- “Dimax Albania” l.t.d.
Environmental Impact Assessment for the project: “Photovoltaic plant Dimax, 2 MW, Fier”
- “Bigwind” l.t.d.
Environmental Impact Assessment for the project: “Photovoltaic plant Bigwind, 2 MW, Fier”
- “Euroing” l.t.d., subcontracted by NATO
Environmental Impact Assessment for the project “Object for storage and distribution of aviation fuel at the military airport of Kuçova.”
- Municipality of Këlcyra
Environmental Impact Assessment for the project “Rehabilitation of the waste dumpsite in Këlcyra”
- GIZ
Environmental Impact Assessment report for the project “Bio Compost Plant Saraci”, in Rrogozhine and Peqin Municipality
- HIMARA MUNICIPALITY – PLAN COUNSULT
- Environmental Impact Assessment report for the project “construction of the waste water treatment plant in Dhermi-Drimadhas, Himara”
- Albanian General Electricity Sha.
Environmental Impact Assessment report for the Photovoltaic Project, Topojë, Fier
- Essegei Srl & Balkan Green Energy
Environmental Impact Assessment report for the project “construction of the Yacht Harbor “ADRIATIC YACHTING MARINA”
- “DELIA GROUP’ Sh.p.k.
- Environmental Impact Assessment report for the Hydropower Project “Thana”, Fier
- Environmental Impact Assessment report for the project Quarry for the use of limestone, Borizane, Kruje
- “MALVINI” Sh.p.k.
Environmental Impact Assessment report for the project “Lining framing lines, Patalej, Kolsh, Kukes”
- “HEC HOTOLISHT” Sh.p.k.
- Environmental Impact Assessment report for the Hydropower Project “Kokreve”
- Environmental Impact Assessment report for the Hydropower Project “Hotolisht Qender”
- Environmental Impact Assessment report for the Hydropower Project “Hotolisht Cota”
- “ELECTRAL BATRA HPP” shpk
- Environmental Impact Assessment report for the Hydropower Project “Batra”
- Environmental Impact Assessment report for the Hydropower Project “Selite”
- Environmental Impact Assessment report for the Hydropower Project “Frankth”
- “INVICTUS” Shpk
Environmental Impact Assessment report for the Hydropower Project “Pampad”
- “TAMARA” Sh.p.k.
- Environmental Impact Assessment report for the Hydropower Project “Grabom”
- Environmental Impact Assessment report for the Hydropower Project “Peshtan”
- Environmental Impact Assessment report for the Hydropower Project “Broje”
- Agricultural University of Tirana
Environmental Impact Assessment report for the project “Center for Education and Professional Training, Agricultural University of Tirana, Faculty of Veterinary Medicine.”
- “Global Resource Trading” l.t.d.
Environmental Impact Assessment report for “Waste recovery plant for hazardous and non-hazardous waste (including R2, R3, R4, R7 or R10 operations)”;
- “Coca Cola Bottling Albania” Sh.p.k.
Environmental Impact Assessment report for the installation “Production and bottling of non-alcoholic beverages, Tirana”
- “3 P LIFE LOGISTIC” l.t.d.
Environmental Impact Assessment report for “Transfer station for hazardous waste”
- “Veko” l.t.d.
Environmental Impact Assessment report for “Photovoltaic plant “Veko Energy” 2 MW, Fier”;
- “ITAL OIL” Shpk
Environmental Impact Assessment report for Installation for reuse of used oils
- ARNA Shpk
- Environmental Impact Assessment report for installation for Intensive rearing of poultry
- Environmental Impact Assessment report for installation for slaughterhouses
- GIZ
- Environmental Impact Assessment for the construction of a composting plant in Rrogozhina, Albania, dated 13.11.2018
- Environmental Impact Assessment for the construction of a stabilization plant in Himara, Albania, dated 12.3.2019
ENVIRONMENTAL PERMIT
- “Global Resource Trading” l.t.d.
Environmental Permit (integrated permit IPPC) for “Waste recovery plant for hazardous and non-hazardous waste (including R2, R3, R4, R7 or R10 operations)”;
- HIMARA MUNICIPALITY – PLAN COUNSULT
Environmental Permit (integrated permit IPPC) for THE installation “Wastewater treatment plant in Dhermi-Drimadhas, Himara”
- “Kappa Star Recycling AL” l.t.d.
Environmental Permit (integrated permit IPPC) for “Transfer station for non-hazardous waste with capacity of 50 tonnes/ day or more”;
- “Coca Cola Bottling Albania” Sh.p.k.
Environmental Permit (integrated permit IPPC) for the installation production and bottling of non alcoholic beverages
- “3 P LIFE LOGISTIC” l.t.d.
Environmental Permit (integrated permit IPPC) for Transfer station for hazardous waste”
- “IGLA” l.t.d.
- Environmental Permit (integrated permit IPPC) for “Tobbacco production plant, Cërrik, Elbasan”;
- Environmental Permit (integrated permit IPPC) for “Tobbacco production plant, Vaqarr, Tirana”
- “ITAL OIL” Shpk
Environmental Permit (integrated permit IPPC) for Installation for reuse of used oils
- GREEN RECYCLING SHPK
Environmental Permit (integrated permit IPPC) for the recycling\management of the Hazardous and non-hazardous waste
- ARNA Shpk
- Environmental Permit (integrated permit IPPC) for installation for Intensive rearing of poultry
- Environmental Permit (integrated permit IPPC) for installation for slaughterhouses
- HIMARA MUNICIPALITY – PLAN COUNSULT
Environmental Permit (integrated permit IPPC) for THE installation “Wastewater treatment plant in Dhermi-Drimadhas, Himara”
- Balkan Center for Cooperation and Development
Preparation of documentation to apply to obtain a type A environmental permit from the Ministry of Environment, for the project “Wastewater treatment plant in the Municipality of Prrenjas”, a project funded by the Slovenian Embassy in Albania, 5.9.2019.
SELF – MONITORING REPORTS
- “Global Resource Trading” l.t.d.
Reports for the self-monitoring for industrial emissions for the installation of “Waste recovery plant for hazardous and non-hazardous waste (including R2, R3, R4, R7 or R10 operations)”;
- “Kappa Star Recycling AL” l.t.d.
Reports for the self-monitoring for industrial emissions for the installation of “Transfer station for non-hazardous waste with capacity of 50 tonnes/ day or more”;
- “Coca Cola Bottling Albania” Sh.p.k.
Reports for the self-monitoring for industrial emissions for the installation production and bottling of non alcoholic beverages (including analyzes of waste water, air, noise)
- “3 P LIFE LOGISTIC” l.t.d.
Reports for the self-monitoring for industrial emissions for the installation of recycling\management of the Hazardous and non-hazardous waste (including analyzes of waste water, air, noise)
- “IGLA” l.t.d.
- Reports for the self-monitoring for industrial emissions for the installation of “Tobbacco production plant, Cërrik, Elbasan”;
- Reports for the self-monitoring for industrial emissions for the installation of “Tobbacco production plant, Vaqarr, Tirana”;
- Reports for the self-monitoring for industrial emissions for the installation of “Tobbacco production plant, Gur i Zi, Shkodra”.
- “Shega Trans” l.l.c.
Reports for the self-monitoring for industrial emissions for the installation of “Waste transfer station for hazardous waste, Vora, Tirana”.
- “Bloja” l.l.c.
Reports for the self-monitoring for industrial emissions for the installation of “Treatment and processing of materials necessary for the production of food products from vegetable raw materials, Tirana”.
- “Prima” l.t.d.
Reports for the self-monitoring for industrial emissions for the installation of “Production of food and beverages and related activities, Tirana”.
- “Albrail” l.t.d.
Reports for the self-monitoring for industrial emissions for the installation of “Distribution and storage of oil and its by-products: a. Storage of oil and its by-products in stationary tanks at any terminal, or loading/unloading of oil and its by-products to/from a mobile tank, rail tank, or inland waterway vessel at the terminal, Fier”.
- “Veko” l.t.d.
Reports for the self-monitoring for industrial emissions for the installation of “”Production of products composed entirely or primarily of wood if the activity includes: sawing, drilling, sanding, carving, turning, woodworking, or chemical treatment of wood, Gjirokastër”.
- “CCALB” l.t.d.
Reports for the self-monitoring for industrial emissions for the installation of “Melting and obtaining non-ferrous metal alloys (colored metals) including recovered products (covering refining and casting in foundries). Melting of mineral substances. Recovery of non-hazardous waste.”
- “IGS Resources” l.t.d.
Reports for the self-monitoring for industrial emissions for the installation of “Production of plastic items, Elbasan”
- GREEN RECYCLING SHPK
Report for the self-monitoring for industrial emissions for the installation of recycling\management of the Hazardous and non-hazardous waste (including analyzes of waste water, air, noise)
- ARNA Shpk
- Reports for the self-monitoring for industrial emissions for installation for Intensive rearing of poultry including analyzes of waste water, air, noise)
- Reports for the self-monitoring for industrial emissions for the installation production and for slaughterhouses (including analyzes of waste water, air, noise)
- “ELLENIKOS” Sh.p.k.
Self-monitoring reports for the for industrial emissions for the installation production of foods (including analyzes of waste water, air, noise)
OTHER REPORTS
- GIZ
- Project “Costumer and Performance Oriented drinking Water and Sanitation Services”, no. 16.2095.4-001.00, purpose of the contract: Screening of the Environmental Impact Assessment and Environmental Permit status of eight WWTPs in Albania, dated 23.6.2020.
- Preparation of the environmental legal documents for the composting scheme in Rrogozhina, Albania, dated 17.10.2018 for the project “Climate-friendly, Integrated Waste and Recycling Management”.
- “Albania Lifestyle” l.t.d.
Preliminary Social, Economic and Strategic Assessment report for the project “Construction of a touristic village in the “Kune – Vain” Lagoon, Lezhë
- Regional Activity Center for Sustainable Consumption and Production (RAC-SCP) Agència de Residus de Catalunya, Spain
Report on business to business practices on waste management in food services company in Albania (food service company and waste management provided in their practices and relations in Albania)
- “TIREX EXPLORATIONS” Sh.p.k.
Sampling and analysis process of heavy metals in the surface waters in Rehova, report on the status of heavy metals in the surface waters monitoring of environmental condition every 6 months and Drafting the self-monitoring reports every 6 months
- AF-MERCADOS Energy Market International S.A. (MERCADOS)
Support in preparation of ESIA training materials as well as arrange and hold three one-day workshops for the trainees selected by the relevant ministries, institutes, etc. in Tirana.
- eMMe & CO
Organizing the staff training on Environmental protection and waste management
- “Universal Energy Co., Ltd.”, China
Environmental social assessment report for the project “Photovoltaic plant with solar panels in Spitall, Durres
- “S&Z Energiesysteme GmbH”
Environmental social assessment report for the project “Photovoltaic plant with solar panels in Remas – Karavasta Lushnje, and Libofshe Fier
- “Global Resource Trading” l.t.d.
- License of III.2.B type for collection and transportation of non-hazardous waste;
- Authorization of non-hazardous waste export;
- Environmental Management Plan for the intallation of “Waste recovery plant for hazardous and non-hazardous waste (including R2, R3, R4, R7 or R10 operations)”;
- Environmental Risk Management Plan for the intallation of “Waste recovery plant for hazardous and non-hazardous waste (including R2, R3, R4, R7 or R10 operations)”;
- Noise Management Plan for the intallation of “Waste recovery plant for hazardous and non-hazardous waste (including R2, R3, R4, R7 or R10 operations)”.
- “Kappa Star Recycling AL” l.t.d.
- Environmental Management Plan for the intallation of “Transfer station for non-hazardous waste with capacity of 50 tonnes/ day or more”;
- Environmental Risk Management Plan for the intallation of “Transfer station for non-hazardous waste with capacity of 50 tonnes/ day or more”;
- Noise Management Plan for the intallation of “Transfer station for non-hazardous waste with capacity of 50 tonnes/ day or more”;